John Muir Medical Center – Interim Sitework

Walnut Creek, CA

Five independent projects designed by six design firms comprised the interim sitework jobs at John Muir Medical Center in Walnut Creek. These included the construction of a new helistop feature, relocation of the existing site utilities for a new master-planned campus expansion, interim loading dock at the existing hospital (OSHPD), new electrical service and telecom improvements (OSHPD), and construction of a mobile medical unit. All five sitework project’s schedules overlapped during construction.

  • Total Square Footage
  • 327,000
  • Architect
  • BFHL, Watry Design